Signature projects · Jalan Besar Stadium

A FIFA-certified artificial grass pitch, built to the world's standard.

One of the biggest projects we've ever delivered: the FIFA 2-Star certified football pitch at Jalan Besar Stadium, laid for the 2010 Youth Olympic Games and inspected by FIFA itself. This is how the surface is installed the professional way, the full process, from the first roll of turf to a live game on national TV.

Completed 2010 Jalan Besar Stadium FIFA 2-Star certified 2010 Youth Olympic Games
The story

Singapore's birthplace of football, reborn.

Jalan Besar Stadium is woven into Singapore's history, first built in 1932, rebuilt and reopened in 2003, and long known as the country's "birthplace of football." In 2008 the pitch was relaid with a higher-grade artificial surface under FIFA's GOAL programme, making it the first-ever FIFA-approved third-generation Football Turf in Singapore, and a regular venue for nationally televised S.League matches.

Two years later it earned its place in Olympic history: on 12 August 2010, the inaugural Youth Olympic Games kicked off here with its very first match, a distinction shared with only a handful of Olympic venues before it.

The surface itself was engineered for true playability. Its V-shaped fibre, built with a spine along each blade like real grass, keeps the pile standing upright and lets the ball sit, roll and bounce naturally, giving players a comfortable kick, familiar bounce and a slide-friendly surface that feels like natural turf underfoot.

In the press · February 2009

As the new turf was being laid, Singapore football blog BoLASEPaKO.com visited the site and spoke with ibuild sportscape director Wong Chee Hoong, who described a weather-proof surface with blades sculpted to feel like real grass, right down to a backbone along each fibre. The report noted that this was the first 2-Star FIFA rating of its kind in Asia, clearing the pitch for international matches — read the original coverage.

Source: BoLASEPaKO.com, February 2009.

01

Arrival of turf

The FIFA-grade turf rolls arrive on site at Jalan Besar Stadium, ready for a stadium-scale install.

FIFA-grade turf rolls arriving by forklift at Jalan Besar Stadium, January 2009
02

Position turf in field

Rolls are positioned across the field and set out to the pitch layout.

Turf rolls positioned across the field at Jalan Besar Stadium, January 2009
03

Sub-base repairs

The engineered sub-base is completed, the precise, free-draining foundation a FIFA pitch demands.

The engineered, free-draining sub-base being completed at Jalan Besar Stadium, January 2009
04

Sub-base inspection by FIFA

FIFA inspects and signs off the sub-base, the standard is verified before a single roll goes down.

FIFA inspecting and signing off the sub-base at Jalan Besar Stadium, February 2009
05

Position turf to rollout

Rolls are staged and aligned, ready to be rolled out across the pitch.

Turf rolls staged along the field edge ready for rollout at Jalan Besar Stadium, February 2009
06

Rollout turf

The turf is rolled out the full length of the field, straight and true.

Turf rolled out the full length of the pitch at Jalan Besar Stadium, February 2009
07

Joining seams

Seams are joined and bonded so the surface plays as one seamless pitch.

The team joining and bonding turf seams at Jalan Besar Stadium, February 2009
08

Inlay the line markings

The regulation field markings are set into the turf to FIFA dimensions.

The team inlaying the white line markings into the pitch at Jalan Besar Stadium, February 2009
09

Completed turf and lines

The green surface and white lines are complete, the pitch takes shape.

The completed green pitch with white line markings at Jalan Besar Stadium, February 2009
10

In-fill with sand

Sand is brushed in to stabilise the fibres and set the surface.

Kiln-dried sand being brushed into the pitch under floodlights at Jalan Besar Stadium, February 2009
11

In-fill with rubber

Rubber infill is added for the ball roll, bounce and player performance a match requires.

Performance rubber infill being spread across the pitch by machine at Jalan Besar Stadium, February 2009
12

Comb the field with brush and net

The field is combed with brush and drag-net to stand the fibres and finish the surface.

Tractor combing the pitch with brush and drag-net to stand the fibres at Jalan Besar Stadium, February 2009
13

Complete install & live game on TV

Install complete, and the pitch goes live, broadcast on national TV.

A live S.League match under floodlights on the completed FIFA-certified pitch at Jalan Besar Stadium

The standard behind a FIFA pitch.

The same rigour that built a FIFA 2-Star stadium pitch goes into every garden, rooftop and green we lay. Tell us about your space.

Trusted by

Chosen by Singapore's landmark names

From resort poolsides and hotel rooftops to preschools and attractions — a selection of the clients who trust our premium Namgrass installs.

Shangri-La Rasa Sentosa — an ibuild sportscape clientShangri-La Rasa Sentosa
Holiday Inn — an ibuild sportscape clientHoliday Inn
iFly Singapore — an ibuild sportscape clientiFly Singapore
Royal Albatross — an ibuild sportscape clientRoyal Albatross
Far East Plaza Residential — an ibuild sportscape clientFar East Plaza Residential
PCF Sparkletots Preschool — an ibuild sportscape clientPCF Sparkletots
Marina Bay Sands Singapore — an ibuild sportscape clientMarina Bay Sands
ibuild sportscape
Premium Namgrass® artificial grass · Singapore since 2008